ACH Group – McLaren Vale Site

Objective/Goals

  • Install a standby generator system to support the infrastructure and medical needs within this aged care facility, supporting both low and high care patients.

Problem

  • No backup power solutions currently in place to support this 39-resident facility
  • The proactive identification by ACH to add in an additional layer of safeguarding for their 10-bedroom house catering for dementia patients + their additional 21 low / high care units

Solution

  • Supplied and installed a 110kVA generator to support the entire McLaren Vale site
  • Integrated with automatic load transfer and control systems for unattended operation

Outcomes

  • Supplied and installed a generator and an Automatic Power Transfer System to assist with continued power for high care residence
Back to Case Studies

Contact Us