99 Gawler Place, Adelaide
Objective / Goals
With a business continuity mindset, the facilities management of this 14-storey inner-city site made the decision to modify their existing generator and fuel tank, to future-proof back-up power.
Problem
- An existing 1100KVA – standby CAT generator system would benefit from an overhaul and recommission while still on site
- The project had a 3-week, onsite timeframe
- To support future usage, it was desirable to incorporate a digital uplift into the existing generator back-up system
Solution
- Supplied and installed a new control system
- Mounted, reinstalled and cleaned the fuel transfer line transferring from the basement level to 2 other locations in the building
- Replaced the day tank and faulty fuel pump system
- Installed a brand-new polish system for the existing fuel tank
Outcome
- The on-site component of the project was completed within a strict 3-week timeframe
- The existing power system was digitised, to align with the site’s technology uplift activities
- An enhanced back-up power system with increased safety, reliability and durability